We have compiled a list of manufacturers, distributors, product information, reference prices, and rankings for Pavement level difference correction work.
ipros is IPROS GMS IPROS One of the largest technical database sites in Japan that collects information on.

Pavement level difference correction work - List of Manufacturers, Suppliers, Companies and Products

Pavement level difference correction work Product List

1~2 item / All 2 items

Displayed results

[Construction Case] Kawaguchiko IC L5 Lane: CO Pavement Slab Step Differential Settlement Correction Work

Plant vehicles deployed inside the toll booth! A case of correcting the unevenness of the CO pavement slab inside the toll booth.

We would like to introduce a case of "CO pavement slab step depression correction work" conducted at the Kawaguchiko IC L5 lane on the Chuo Expressway Fujiyoshida Line in Yamanashi Prefecture. The construction period was one day. Step correction of the CO pavement slabs within the toll booth was carried out. After traffic regulation, a construction plant vehicle was positioned within the toll booth for the work. Please feel free to contact us if you have any requests. 【Case Overview】 ■ Area: Chuo Expressway Fujiyoshida Line Maintenance Work Kawaguchiko IC L5 Lane ■ Construction Period: 1 day (April 2011) ■ Client: Central Japan Expressway Company ■ General Contractor: Central Japan Highway Maintenance Company *For more details, please refer to the PDF document or feel free to contact us.

  • Other contract services
  • Exhibition planning/construction
  • Calibration and repair

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] Highway Toll Booth Concrete Pavement: Leveling Work

An example of quickly correcting the unevenness in the concrete pavement slab at a highway toll booth!

We would like to introduce a case of "leveling repair work" conducted on the concrete pavement slab at a toll booth on the expressway in Ehime Prefecture. Due to ground subsidence, a height difference occurred in the concrete pavement slab at the toll booth, affecting the passage of vehicles. We injected polyurethane resin under the subsided concrete pavement slab and corrected the 30mm height difference in a short period of time. 【Case Overview】 ■ Construction Area: 12m2 ■ Construction Period: 1 day ■ Maximum Height Difference: 30mm *For more details, please refer to the PDF document or feel free to contact us.

  • Other contract services
  • Exhibition planning/construction
  • Calibration and repair

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Related Categories of Pavement level difference correction work