[Construction Case] Kawaguchiko IC L5 Lane: CO Pavement Slab Step Differential Settlement Correction Work
Plant vehicles deployed inside the toll booth! A case of correcting the unevenness of the CO pavement slab inside the toll booth.
We would like to introduce a case of "CO pavement slab step depression correction work" conducted at the Kawaguchiko IC L5 lane on the Chuo Expressway Fujiyoshida Line in Yamanashi Prefecture. The construction period was one day. Step correction of the CO pavement slabs within the toll booth was carried out. After traffic regulation, a construction plant vehicle was positioned within the toll booth for the work. Please feel free to contact us if you have any requests. 【Case Overview】 ■ Area: Chuo Expressway Fujiyoshida Line Maintenance Work Kawaguchiko IC L5 Lane ■ Construction Period: 1 day (April 2011) ■ Client: Central Japan Expressway Company ■ General Contractor: Central Japan Highway Maintenance Company *For more details, please refer to the PDF document or feel free to contact us.
- Company:アップコン 沈下修正の専門家【全国対応】【本社】神奈川県川崎市【事務所】札幌・仙台・名古屋・大阪・福岡
- Price:Other